Homeprint
Homeowner guide · British Columbia

Building permits in British Columbia

In British Columbia, municipalities issue building permits under the BC Building Code — the 2024 edition took effect March 8, 2024 — with one famous exception: Vancouver, which under the Vancouver Charter writes its own Vancouver Building By-law, a power no other BC municipality has. New-home construction adds a second gate: builders must be licensed with BC Housing and the home enrolled in mandatory 2-5-10 warranty coverage before a permit is issued, unless you qualify as an owner-builder.

BC Building Code 2024 in force for new applications
Mar 8, 2024

BC Building Code 2024 in force for new applications

Years of mandatory new-home warranty: labour, envelope, structure
2-5-10

Years of mandatory new-home warranty: labour, envelope, structure

Vancouver writes its own building bylaw under the Vancouver Charter
1 city

Vancouver writes its own building bylaw under the Vancouver Charter

Why Vancouver is different

Every other BC municipality that regulates construction must adopt the BC Building Code as-is; Vancouver's Charter lets it legislate its own. The Vancouver Building By-law tracks the provincial code closely — the current edition is based on the 2024 BC Building Code — but layers on city-specific requirements, historically ahead of the province on energy efficiency and accessibility. If your project is in Vancouver proper, the VBBL is your code; step across the boundary into Burnaby or Richmond and it's the BC Building Code again.

Permits, licensed builders, and the 2-5-10 warranty

For new homes, BC ties the permit to consumer protection. Under the Homeowner Protection Act, a residential builder must be licensed with BC Housing and provide third-party home warranty insurance — commonly called 2-5-10 for its two years on labour and materials, five on the building envelope, and ten on structure — before a building permit will issue. Owner-builders can apply for an authorization to build their own home instead, which comes with its own obligations. For a buyer, the warranty enrolment is part of the home's permit-era paper trail and worth verifying alongside the permit file itself.

With Homeprint

Homeprint keeps your home's whole permit story

Everything above lives in scattered municipal files — if it was kept at all. Homeprint pulls your home's full permit history free from municipal records in most major Canadian cities, then keeps the record going: every new permit, drawing, and renovation document filed against your address in one place, with reminders drawn from what the history actually implies.

  • Your complete permit history, pulled free from municipal records — no FOI forms, no counter visits
  • Every new permit and renovation document kept on your home's permanent record for the day you sell
  • Reminders built from the history itself — roof age, warranty windows, service dates

Building permits in British Columbia — FAQ

Let Homeprint do the remembering

Add your documents once — Homeprint tracks the dates, the renewals, and the deadlines, and tells you when it's time to act.